206944 Integration of Re-Boilers
206944 Integration of Re-Boilers
Wednesday, March 16, 2011: 11:25 AM
Crystal C (Hyatt Regency Chicago)
The approaches currently used by process integration specialists to assess the opportunities for the integration of re-boilers are frequently erroneous and lead to proposals that have to be rejected at the detailed engineering stages (or worse, to re-boilers that do not perform properly).
This paper examines the integration of both vertical and horizontal thermo-siphon reboilers.
It covers the following topics:
1. how should the heat load-temperature characteristics be incorporated into a “pinch analysis”
2. how should the hot stream be matched with the re-boiler duty
3. what is the minimum temperature difference for the re-boiler
4. what is the maximum temperature difference for the re-boiler
5. how does distillation column control affect the integration
6. when should indirect integration be employed
See more of this Session: Contributions to Distillation Troubleshooting and Control
See more of this Group/Topical: Topical 8: The Dr. James Fair Heritage Distillation Symposium
See more of this Group/Topical: Topical 8: The Dr. James Fair Heritage Distillation Symposium