The projects were part of a large program where significant benefit was obtained from the sharing of experiences by the two project teams. Although the two units are in principle identical, regulatory control differences led to two different approaches in solving the control problem.
A curious occurrence during the execution of the projects was the discrepancy between the RTO models and the DMCplus empirical models on a particular MV/CV pair. This was a good example of exercising caution and making sure you compare “apples to apples” when doing a RTO/DMC consistency check.
Results of the C3 Splitter controller objectives will be presented:
• Decrease propylene product loss in the bottoms.
• Improve overhead propylene composition control.
• Maintain MAPD at or below the high limit.
See more of #22 - Ethylene Plant Process Control (T2004)
See more of Topical 2: Ethylene Producers Conference
See more of The 2006 Spring National Meeting