Operational improvements that were successfully implemented during the campaign included turnaround of the production bioreactor in less than 24 hours and use of 500-L media totes to reduce the number of media containers and aseptic connections to the bioreactor by more than 50%. Additional efficiencies were gained through implementation of improved oxygen manifolds to enhance oxygen supply capacity four-fold and increased working volume of the production bioreactor to increase volumetric productivity by 8%. The resource utilization strategy adopted during this campaign involved cross-training of staff on both upstream and downstream operations, thus permitting a 24-hour turnaround between batches while ultimately reducing staffing requirements by 35% from previous campaign batches.
The successful execution of the operational and resource utilization strategies permitted the required number of bulk runs to be completed on schedule with 100% success rate. In addition, these efficiencies will allow the area to have greater flexibility and will provide for additional capacity to support future simultaneous multi-product processing.