| Wednesday, 25 April 2007: 8:30 AM-11:30 AM | |||
| Meeting Room 381 A/B/C (George R Brown Convention Center in Houston) | |||
Topical 2: Ethylene Producers Conference (T2) | |||
| #100 - Ethylene Plant Rotating Equipment (T2006) | |||
| This topic will cover compressor, turbine and pump issues associated with the ethylene industry. This will be of interest to all associated with operating, maintaining, designing or troubleshooting of these machines. | |||
| Chair: | Alan S. Pyle | ||
| CoChair: | Kazim Ahktar | ||
| 8:30 AM | Introductory Remarks | ||
| 8:35 AM | 100b | Operator Surveillance of Critical Machinery in Ethylene Plants Mark Cooper | |
| 8:55 AM | 100c | Ethylene Plant Cold Service Pump Startup Procedures Charlie Rutan | |
| 9:20 AM | 100a | New Technique for on Line Washing of Large Condensing Steam Turbines Satoshi Hata | |
| 9:50 AM | Break | ||
| 10:10 AM | 100d | Compressor Fouling Caused by Capacity Increase without Knockout Pot Redesign Johnny Dugas | |
| 10:35 AM | 100e | Design Considerations for Effective Liquid Removal in Suction Drums Bernard Kalis | |
| 11:00 AM | 100f | Antifouling and Corrosion Resistant Coatings for Cracked Gas Compressors and Steam Turbines Phillip Dowson | |
| 11:25 AM | Concluding Remarks | ||
See more of Topical 2: Ethylene Producers Conference
See more of The 2007 Spring National Meeting