CFD Study on Natural Gas Fluidized Bed Combustors Felix Severino Farias Junior1, Rubens Maciel Filho1, Sergio Lucena2 and Jornandes Dias Silva2, (1)Laboratory of Optimization, Design and Advanced Control (LOPCA), UNICAMP, Faculty of Chemical Engineering. State University of Campinas (UNICAMP), P.O.Box 6066, CEP 13081-970, Campinas, SP, Brazil, (2)Chemical Engineering Department, Federal University of Pernambuco (UFPE), Artur de Sá, SN, Cidade Universitária, CEP 50740-521, Recife, PE, Brazil |
Rasgas Makes Extensive Use of Process Operator Training Simulators in LNG Operations Ahmet Pekediz, Honeywell Process Solutions, 250 York Street, Suite 300, Wellington Square, London, ON N6A 6K2, Canada, James M. Dawson, Ras Gas Company Limited, P.O. Box 24200, Doha, Qatar and John W. Womack, Markham Dynamics Corporation, 32 Markham Road, Princeton, NJ 08540 |
Performance Characteristics of LNG Tandem Expanders Hans Kimmel, Ebara International Corporation, Sparks, NV 22222 and Chen-Hwa Chiu, Fuels and Petrochemicals Division/Group 16, Chevron Energy Technology Company, 1500 Louisiana Street, Houston, TX 77002 |
Pressure Induced Non-Linear Oscillations in Two-Phase LNG Pipe Flow Andrew Kimmel, Department of Physics, University of Nevada at Reno, 561 Keystone Avenue, Reno, NV 89503 |
How Big Is the Area Required for LNG Base Load Plant and Their Design Considerations J. C. Kuo, Chevron Energy Technology Company, 1500 Louisiana Street, Houston, TX 77002 |
LNG Rollover: Converting a Safety Problem to Tank Loading Operational Asset YanJun Wang, Chemical Engineering, Mary Kay O'Connor Process Safety Center, College Station, TX 77057 and Harry West, Department of Chemical Engineering, Texas A&M University, College Station, TX 77057 |
A Step Change in LNG Operations through Advanced Process Control Kees Den Bakker, Dept GSEO, Shell Global Solutions International B.V., P.O. Box 38000, 1030 BN Amsterdam, Netherlands |
|